The school's seventh building was completed in 1986 as a single level brick, solid fill concrete foundation. The seating and stage curtain was added in 1992. In 2000 an extension was made to the building for a staff room along with renovations and upgrade of flooring. After Drama moved to the Blue Box Theatre in 1999, it became the Music Building.